EWHO page logo

Drilling for Rebar and Pouring Footings

2009-10-05
Tags: construction, pier, bedrock

The team digging the deck footings is here today. Confirmed, they showed me the bedrock base the holes hit. They’ll use a concrete drill to drill into it and then drive in rebars that will stick up into the poured concrete. That’s going to be sturdy.

I test-fitted the J-Bolt form into the sonotube when they brought it in — now would be a good time to find it doesn’t fit, rather than after they pour concrete. It fits — phew.

Previous
Posts Index
Next

© 2026 R.McDonald