Repaired caulking, more interior work

2009-11-17

It was a clear and sunny day today, no rain. The temperature reached a high of 6 degrees, so it was on the cool side. There was ice on the dome this morning and frost on the deck until the sun melted it off around noon. I used the pleasant day to make some more progress on final touch-ups:

I stripped out the wall-to-deck exterior caulking — that white-becomes-clear stuff that was destroyed by rain — and replaced it with traditional exterior clear silicone. I also put another layer of caulking in the primary dome seam, around the shelf hanger bolts, and various other touch-ups. It’s supposed to be below zero tonight, but 6 to 8 degrees again tomorrow, so the caulk will have another good day of warm sun to cure.

I installed eye bolts (replacing wall fastening bolts) to secure the polyethylene storm cover, so it is ready to use.

Finally, I began tidying the interior cabling. Installed cable guides on the pier, for the Gemini power, accessories power, and USB cable. I will be installing a cable channel on the floor to keep everything tangle-free.

As part of the cabling activity, I began setting up the wide-field imaging train:

Indoors, I made several cables: